A dedicated path outdoors.
Follow the dryer manual. Use independent outdoor exhaust; listed, labeled condensing dryers have an exception.
Read the full ICC sectionDryer exhaust / reference guide
Materials. Connections. Length. The outdoor outlet. See what the residential model code says—and which adopted edition your building department lists.
The actual reference points
Original plain-language summaries below. Follow the source links for the complete provisions and exceptions.
Follow the dryer manual. Use independent outdoor exhaust; listed, labeled condensing dryers have an exception.
Read the full ICC sectionFixed exhaust uses smooth metal: nominal 4-inch diameter, minimum 0.0157-inch thickness (28 gauge).
Read the full ICC sectionChapter 15 limits support spacing to 12 feet. Seal and mechanically fasten joints; inward fastener projection cannot exceed 1/8 inch.
Read the full ICC sectionUse one UL 2158A-listed, labeled transition, at most 8 feet long, never concealed within construction.
Read the full ICC sectionProvide a backdraft damper and 12.5-square-inch minimum passage. Without manufacturer location instructions, maintain 3 feet from building openings, including ventilated soffits.
Read the full ICC sectionThe specified method allows 35 feet minus fitting deductions, excluding the transition. Other methods use manufacturer instructions.
Read the full ICC sectionDomestic booster fans are prohibited. Dryer-exhaust power ventilators require UL 705 conformity and manufacturer-directed installation.
Read the full ICC sectionAbove 35 feet equivalent length, place a permanent length label within 6 feet of the exhaust connection.
Read the full ICC sectionA worked example
Specified-method example: two 4-inch-radius mitered 90° elbows.
Baseline
Fittings
Straight duct
Keep the selected method and fitting geometry consistent. Have the professional document the basis for your actual route.
2024 IRC M1502.4.6.1 + its table2018 IRC references: length M1502.4.5.1; labeling M1502.4.6. Match the edition.
Open the 2018 IRC referenceAddress first. Edition second.
Source review: . IRC = residential code; IMC = mechanical code. These are separate code families, not interchangeable labels.
These rows describe each authority’s published adoption information. Use the official links to confirm your project’s requirements.
| Jurisdiction | Published editions | Timing and project context | Official sources |
|---|---|---|---|
| Surprise | 2024 IRC + 2024 IMCWith local amendments | Adopted December 2, 2025; effective January 1, 2026. The city’s amendment document is dated January 1, 2026. Review its residential or mechanical provisions for the applicable project scope. | |
| Peoria | 2018 IRC + 2018 IMCWith local amendments | The current city index lists 2018 editions. Council minutes confirm adoption on May 21, 2019 (Ordinance 2019-12). The final residential/mechanical effective date was not verified. An earlier city announcement gives an estimate only; confirm the applicable effective date and amendments with Peoria. | |
| Glendale | 2024 IRC + 2024 IMCWith local amendments | Adopted December 9, 2025; effective January 9, 2026, according to the city’s implementation memo. The memo includes transition exceptions and a January 9, 2027 update deadline for previously approved standard residential plans. Check the project’s approval history. | |
| Goodyear | 2024 IRC + 2024 IMCWith local amendments | Adopted March 23, 2026. Technical building codes effective June 23, 2026. City amendments apply. The separately listed fire-code effective date is different; do not substitute it for the building-code date. | |
| Buckeye | 2024 IRC + 2024 IMCWith local amendments | Effective for new project submissions on or after January 1, 2025. Earlier approved standard plans have transition provisions. Confirm the code basis for the particular project rather than relying on its neighborhood’s age. | |
| Sun City / unincorporated Maricopa County | 2018 now; 2024 transition announcedWith local amendments | As of this November 12 review, the county lists 2018 IRC/IMC. Its newer implementation notice reports 2024 adoption October 21, 2026 and a November 20, 2026 start for initial plan reviews. The notice allows limited 2018 transitions and a separate standard-plan deadline. Confirm the project basis and current amendments. Sun City is a county community; verify the parcel and any fire-district review. |
On a small screen, scroll the table sideways to read every column.
Make the review specific
An assessment can describe the existing condition and proposed work. The building authority answers local-code and official inspection questions.
Request a vent assessmentKeep the model number and installation manual handy. Do not move the dryer or disturb its gas or electrical connections to find them.
Our assessment covers the accessible route and the proposed cleaning, repair, replacement or rerouting. Leave inaccessible sections to the professional.
Confirm the address, adopted edition, relevant amendments and the installation requirements that apply to the specific scope. Keep the answer with the work record.
Keep the full text close
The 2024 summaries refer to the ICC printings linked here. Read the full provisions alongside your local authority’s adopted text and amendments.
This selected model-code guide and worked example are not an installation plan or a compliance finding. The responsible building authority, adopted edition, amendments, building type, existing approvals and proposed work determine the applicable requirements. A postal city name alone does not identify that authority. Commercial laundry and shared exhaust need their own review. This guide does not include an amendment-by-amendment compliance analysis for every jurisdiction.